The facility manager’s Monday: the “smart” procurement plan meets the building.

Procurement locks in a flat block on Friday. On Monday the building’s load follows shifts and afternoon heat, so extra energy is bought at peak market prices and the overnight surplus is sold back. Shape the plan to the building first.

  • October 26, 2026
  • Carousel
  • 8 slides
  • 2 min read
View on LinkedIn (opens in a new tab)Share on LinkedIn (opens in a new tab)

Carousel slides: The facility manager’s Monday: the “smart” procurement plan meets the building.

  1. The facility manager's Monday: the "smart" procurement plan meets the building. Signed on Friday, tested by the site on Monday morning.
  2. Friday, the decision room: Procurement locks in a flat block of 4.0 MW every hour at a fixed price. Clean on paper, but the site load is unknown and Facilities is not in the room. Illustrative.
  3. Monday 06:00: the building wakes up. Shifts start, lines run and cooling follows the afternoon heat; night load is 2.6 MW, the afternoon peak 5.6 MW, against a 4.0 MW block. Illustrative.
  4. Above the block: the extra is bought at market price. Day shift and cooling run over the block for 15 of 24 hours, in the day peak hours when power tends to cost most. Illustrative.
  5. Below the block: the surplus is sold back. Overnight the site uses less than it bought for 9 of 24 hours, and the unused energy is resold at market in low-price night hours. Illustrative.
  6. "Just move the load": most of it can't move. Production runs to schedule, cooling has comfort limits, and only a small share of the load is flexible. Illustrative.
  7. Back in the decision room: shape the plan to the building, with a 2.8 MW night block and a 4.9 MW day block. Bring the load profile and site limits in before signing: which hours, what can move, who signs off. Illustrative.
  8. The Decision Question: a procurement decision only works if operations can live with it. Put Procurement and Facilities in the same room with the same data: load profile, site limits and contract strategy. See how VIPAS works at vipasenergy.com.

Slide 1 of 8

Open slide 1 full size (opens in a new tab)

The post

On Friday, Procurement locks in a flat block. The same volume every hour, at a fixed price. Clean on paper.

On Monday at 6 a.m., the building wakes up. Shifts start, lines run, and cooling follows the afternoon heat. The load stops being flat.

Above the block, the extra energy is bought at market price, in the hours when power tends to cost most.

Below the block, overnight, the site uses less than it bought. The unused energy is sold back at whatever the market pays.

“Just move the load” rarely works. Production runs to schedule, cooling has comfort and safety limits, and only a small share of the load is truly flexible.

The fix starts in the decision room. Bring the load profile and the site’s limits in before the contract is signed:

Which hours do we actually use? Which load can move, and which can’t? Who signs off: Procurement, or Procurement with Facilities?

A procurement decision only works if operations can live with it.

NoteOne illustrative weekday, hour by hour.

  • #EnergyProcurement
  • #FacilitiesManagement
  • #EnergyManagement
  • #COO
  • #Operations

About this post

Published
October 26, 2026
Format
Carousel, 8 slides
Series
The Facility Manager’s Monday
Reading time
2 min
  • Open on LinkedIn (opens in a new tab)
  • Follow VIPAS Energy (opens in a new tab)
  • Slide-by-slide transcript ↓
Slide by slide

What each slide says.

A text version of the carousel. Select a thumbnail to show that slide in the viewer above.

  1. Show slide 1 in the viewer
    Slide 01

    Slide 1: The facility manager's Monday: the "smart" procurement plan meets the building. Signed on Friday, tested by the site on Monday morning.

  2. Show slide 2 in the viewer
    Slide 02

    Slide 2: Friday, the decision room: Procurement locks in a flat block of 4.0 MW every hour at a fixed price. Clean on paper, but the site load is unknown and Facilities is not in the room. Illustrative.

  3. Show slide 3 in the viewer
    Slide 03

    Slide 3: Monday 06:00: the building wakes up. Shifts start, lines run and cooling follows the afternoon heat; night load is 2.6 MW, the afternoon peak 5.6 MW, against a 4.0 MW block. Illustrative.

  4. Show slide 4 in the viewer
    Slide 04

    Slide 4: Above the block: the extra is bought at market price. Day shift and cooling run over the block for 15 of 24 hours, in the day peak hours when power tends to cost most. Illustrative.

  5. Show slide 5 in the viewer
    Slide 05

    Slide 5: Below the block: the surplus is sold back. Overnight the site uses less than it bought for 9 of 24 hours, and the unused energy is resold at market in low-price night hours. Illustrative.

  6. Show slide 6 in the viewer
    Slide 06

    Slide 6: "Just move the load": most of it can't move. Production runs to schedule, cooling has comfort limits, and only a small share of the load is flexible. Illustrative.

  7. Show slide 7 in the viewer
    Slide 07

    Slide 7: Back in the decision room: shape the plan to the building, with a 2.8 MW night block and a 4.9 MW day block. Bring the load profile and site limits in before signing: which hours, what can move, who signs off. Illustrative.

  8. Show slide 8 in the viewer
    Slide 08

    Slide 8: The Decision Question: a procurement decision only works if operations can live with it. Put Procurement and Facilities in the same room with the same data: load profile, site limits and contract strategy. See how VIPAS works at vipasenergy.com.

← Older postTwo systems can show different answers without either one being “wrong.”Newer post →“Should we lock next year’s energy price for our largest site?”
More from LinkedIn

Keep reading.

All insights →
  • 8 slides

    Systems That Don’t TalkNov 20, 2026

    The data moved. The meaning didn’t.

    The nightly load ran with zero errors, yet nobody can say what 48,200 means. Source, calendar, units, normalization and site identity are five labels that need to travel with every number.

    Read post →LinkedIn : The data moved. The meaning didn’t. (opens in a new tab)
  • Article

    Connect, Don’t Replace · NewsletterNov 19, 2026

    Connect, Don’t Replace: What to Demand From an Energy Modernization Program

    Most enterprises already run the systems an energy decision needs. Before signing a modernization program, demand five things: integration, data ownership, governance, interoperability and change management.

    Read post →LinkedIn : Connect, Don’t Replace: What to Demand From an Energy Modernization Program (opens in a new tab)
  • 8 slides

    The Decision QuestionNov 18, 2026

    The CIO’s Monday: five systems, one executive answer.

    One CEO question lives in five systems with five owners and five as-of dates. A new dashboard shows the disagreement faster; trusted context across systems resolves it.

    Read post →LinkedIn : The CIO’s Monday: five systems, one executive answer. (opens in a new tab)
Start with one real workflow

Where is energy fragmentation slowing your team down?

Bring a demand, sourcing, tariff, approval or reconciliation challenge. We’ll explore what a clearer operating path could look like.

Book a discovery conversation →
VIPAS Energy

Building a connected operating layer for modern energy management.

Explore

PlatformCapabilitiesOperating model

Company

About VIPASMedia & InsightsTrust & governanceContact

Use cases

Multi-site demandRates & tariffsApprovalsLinkedIn
© 2026 VIPAS Energy.Connected decisions. Clearer outcomes.