The nightly load ran. 12,480 records sent, 12,480 received, zero errors.
And nobody can say what 48,200 means.
Was it a meter read or the supplier’s estimate? Calendar October, or a billing period that ran 3 October to 2 November? kWh or MWh? Raw, or weather-adjusted? And which site is it in the ERP, where the same plant is cost centre CC-4410?
The data moved. The meaning didn’t.
Most integration problems look like this. Not a broken pipe, but five labels that stayed behind:
1. Source priority: which source wins when two disagree 2. Calendar: which “October” the number belongs to 3. Units: what it is measured in, and how it converts 4. Normalization: raw or adjusted, and on what basis 5. Identity: which site, on one shared register
Agree those once, and every number can carry them wherever it goes.
Data can move successfully and still lose the context needed for a decision.
NoteAll figures are illustrative.