Measurement & Verification

Did weather hide the ROI of your efficiency project?

A milder winter can make a modest project look like a big win, and a hotter summer can hide one that works. Normalize the baseline for weather, and for production, before judging ROI.

  • LinkedIn video
  • 1 min read
Watch on LinkedIn (opens in a new tab) · 1:02

The post

Your efficiency project went live and energy use dropped.

The obvious question is: "What was the ROI?"

But if the weather was different, part of that change was never the project.

A milder winter can make a modest project look like a big win. A hotter summer can hide a project that is genuinely working.

That's why recognised methods like IPMVP and ASHRAE Guideline 14 normalize the baseline for weather first. And if production volumes changed, the baseline needs adjusting for that too.

Before judging the result, connect weather data, the pre-project baseline, meter data, production volumes and the project's economics.

Only then is ROI a real number.

Before judging ROI, separate operating change from weather change.

  • #EnergyEfficiency
  • #EnergyManagement
  • #MandV
  • #IPMVP
  • #ROI
  • #IndustrialEnergy
  • #Sustainability
  • #VIPASEnergy
More from LinkedIn

Keep reading.

All insights
Start with one real workflow

Where is energy fragmentation slowing your team down?

Bring a demand, sourcing, tariff, approval or reconciliation challenge. We’ll explore what a clearer operating path could look like.

Book a discovery conversation