Your efficiency project cut demand by 20%. The meter says it's working. Facilities is ready to call it a win.
But procurement bought this year's energy for last year's load.
Here is how it plays out (illustrative example):
1. Demand drops from 8,000 MWh to 6,400 MWh. Good news on the meter. 2. The contract still fixes 8,000 MWh at $100 per MWh. The energy was bought for the old load. 3. The site now holds 1,600 MWh it won't use. It is over-hedged. 4. That surplus is sold back at today's market price. Bought at $100, sold at $70: a $48,000 loss on 1,600 MWh. 5. Volume terms can add a charge. A ±10% tolerance band on 8,000 MWh covers 7,200 to 8,800 MWh. At 6,400 MWh, actual demand falls outside the band, and a volume charge of around $20,000 can apply. 6. The saving is real, it's just smaller. An expected $160k saving becomes about $92k once the resale loss and the volume charge are counted.
Exposure cuts both ways: if market prices rise, the surplus can gain. Either way, it is exposure nobody planned for.
The fix is not to stop saving energy. It is to treat the facility project and the hedge position as one decision, not two: • Facility project (what changes, and when) • Demand forecast (the updated load) • Hedge position (fixed volumes and prices) • Volume terms (tolerance band and charges)
Changing the load can change the position you thought you bought.
Swipe through the carousel to see how a demand project meets the contract.